3 BHK in Chembur East Under ₹3 Crore - Connectivity Guide

Close
Close

3 BHK in Chembur East Under ₹3 Crore - Which Ones Are Actually Well Connected?

0 like
By Chandak Group
10 Mins
17th October 2026
0 like

3 BHK in Chembur East Under ₹3 Crore - Which Ones Are Actually Well Connected?

For years, Chembur East was known for being a little tucked away from the rest of the city. That picture is changing. From Chandak Highscape City, the Eastern Freeway is 1 km away, BKC 6.3 km and the international airport 11 km. The Santacruz Chembur Link Road (SCLR) is now complete, and Metro Line 2B has opened its first stretch, with its extension to Chembur under way. If you are looking at a 3 BHK in Chembur East under ₹3 crore, this guide explains how well connected the area is today, and what is still to come.


Roads first - the freeway at your doorstep

One of the most significant factors contributing to the improved connectivity of Chembur East has been the development of its road infrastructure and access. Highscape City is 1 km from the Eastern Freeway, 3.6 km from the Eastern Express Highway and 4.3 km from the SCLR. When the Eastern Freeway opened in 2013, press reports put the trip from Chembur to South Mumbai at about 16 to 20 minutes, a journey that once took far longer.

The table below shows how the project sits against the places most residents travel to. The distances are approximate, for landmarks as on April 2024.

Destination Distance from project
Eastern Freeway1 km
BPCL Monorail station1.7 km
Chembur railway station4.9 km
BKC Connector5.2 km
Lokmanya Tilak Terminus5.8 km
BKC6.3 km
Ghatkopar Metro station7.4 km
Atal Setu9.2 km
International airport11 km
Lower Parel11 km
Powai15.8 km
Nariman Point18 km

BKC is roughly a 20 to 30 minute drive at peak hours. Chembur railway station is 4.9 km away, so day-to-day travel here leans on road, monorail and metro more than on the suburban train.

What is Running, and What is Coming

The roads around Highscape City are open, and the metro network is still being completed. Here is where each link stands.

Link Status Details
Eastern Freeway, Sion BKC Connector, monorail Running Distances are in the table above
SCLR Complete The final 1.40 km link, from Bharat Nagar Road to Vakola Junction, opened around 13 August 2026. It completes the 10.30 km corridor between the Eastern and Western Express Highways, and MMRDA expects it to cut travel time between BKC and the WEH by up to 35 minutes
Metro Line 2B Partly open Phase 1, Diamond Garden to Mandale, opened in April 2026. The Chembur extension was awaiting safety clearance in late April 2026
Metro Lines 4 and 8 Proposed Listed as upcoming

For the metro story in more depth, read Chandak Highscape City and the Rise of Chembur with Metro 2B.

A 3 BHK under ₹3 crore

Highscape City offers an Elite 3 BHK layout. Indicative pricing is around ₹2.45 to ₹2.65 crore, before stamp duty, registration, GST and parking. Once those are added, the all-in figure can approach or pass ₹3 crore, so it is the all-in number worth planning around. The home loan EMI calculator turns it into a monthly instalment.

Paperwork and progress

Chandak Highscape City is registered with MahaRERA under number P51800055726, and its possession date and RERA carpet areas are public on the MahaRERA website. The project is funded by and mortgaged in favour of Tata Capital Housing Finance Limited.

Progress is dated on the project page. By September 2026, Zenith (Tower 2) had completed its 23rd floor, Summit (Tower 8) its 20th floor, Pinnacle (Tower 7) its 19th floor, and Skyline (Tower 1) its terrace.

Chembur's Largest and Greenest Address

Chandak describes Highscape City as Chembur's largest and greenest residential project, citing Cushman & Wakefield's report "Chembur - Comparative Analysis, April 2024." It spreads across 1.5+ acres, with a three-level clubhouse and 45+ amenities. St. Sebastian's High School is 900 m away, Ryan International School 1.7 km, and Zen Multi Speciality Hospital 3.5 km.

To see the towers and the floors on offer, enquire or book a site visit. You can also explore the area in Chembur's star-studded secrets, or browse all flats in Chembur East and Chandak's 3 BHK flats.


FAQs

Is Metro Line 2B running at Chembur?

Partly. Phase 1, between Diamond Garden and Mandale, opened in April 2026, and the Chembur extension was awaiting safety clearance in late April 2026.

How far is Highscape City from BKC?

BKC is 6.3 km away and the BKC Connector 5.2 km, as on April 2024. That is roughly a 20 to 30 minute drive at peak hours.

How is the project's RERA registration verified?

The number P51800055726 is searchable on the MahaRERA website, which shows the project page, RERA carpet areas and possession date.

How far along is construction?

By September 2026, the 23rd floor of Zenith (Tower 2), the 20th floor of Summit (Tower 8), the 19th floor of Pinnacle (Tower 7) and the terrace of Skyline (Tower 1) were complete.